General contractor

General contractor for a complete apartment renovation in Budapest

One contract, one price, one person answerable.

A general contractor is not one of the trades. They are the one who carries the sequence, the deadline and the mistakes, so that you do not have to.

A tidy site in a Budapest apartment renovation: the floor covered, fresh plaster on the walls, plasterboard on a pallet
  • One contract, one person to call.
  • A fixed price and a schedule.
  • Our own crew does the building work.
  • Whole apartments, any size.
How we work

What does a general contractor actually do?

Organises and carries out the whole job, from strip-out to handover. Not simply working in the apartment: being answerable for the trades following each other in the right order and at the right time.

Hiring trades separately

  • You call everyone, and you work out the order.
  • If the tiler slips, the painter stands idle, and the lost time is yours.
  • When something goes wrong, each one points at the other.
  • Five invoices, five deadlines, five phone numbers.

With a general contractor

  • One contract, one price, one schedule.
  • The sequence and the coordination are ours to handle.
  • When something goes wrong, one company answers for it.
  • One invoice and one person to call.
First steps

From the first call to the contract

  1. One call or email.

    Ten minutes: where the apartment is, how big it is, and what you want.

  2. A free survey.

    We measure the apartment and go through it with you, room by room.

  3. A written quote within two days.

    A fixed price and a schedule. The quote is valid for 30 days.

  4. The contract.

    The price and the schedule are part of the contract. You pay in stages, each at its start; the final instalment is due after handover.

Before the strip-out

Plans, the engineer and the building

We settle these before anything comes down. Design and the structural engineer are priced separately, and dealing with the building is our job.

Plans and the engineer

  • If you need plans, we bring in an architect or interior designer we know and trust.
  • If you have your own designer, we work from their plans.
  • If a structural engineer is needed, for example to take down a wall, we bring one in.
  • Design and the engineer are priced separately.

The building and permits

  • We notify the residents’ association when the work starts.
  • If the work touches the shared pipes, we agree the timing with them.
  • If a container is needed, we arrange it and the public-space permit.
  • Noisy work happens in the hours the house rules allow.
Plasterboard, plaster sacks and tile boxes stacked in an apartment under renovation, ready for the next trade
Step by step

What order does the work run in?

Six stages, in this order. The order matters: each stage builds on the one before it.

  1. Strip-out.

    Everything that goes, goes, and removing it is our job too. This is when you find out what is behind the walls.

  2. First fix.

    Electrics, water, gas and heating, chased into the walls and the floor. This is the stage that cannot be changed cheaply later.

  3. Walls, screed and plaster.

    New walls in masonry or drywall, false ceilings, then flat, true surfaces. Get this wrong and everything after it is wrong too, however expensive the tiles are.

  4. Tiling.

    Bathroom and kitchen. This is where the finished apartment starts to become visible.

  5. Paint and flooring.

    In that order, so a finished floor never has to be covered up and risked.

  6. Second fix and handover.

    Kitchen, sanitaryware, switches, cleaning. At the end we walk through the apartment with you and sign a handover record.

A tiler pressing a large tile onto a bathroom wall, with levelling clips and a spirit level
Our own crew

Who does the work?

Our own crew does the building work: strip-out, plastering, plasterboard, tiling and painting. The job stays with us from the first day to the last.

Electrical, gas and plumbing work is done by specialists licensed for it, because Hungarian law requires that licence. They work under our contract too. You are dealing with one company even when six people are in the apartment.

One contract. One price. One schedule. One person to call. One company answerable.

If something slips, it is not yours to chase.

The point of a general contractor is not that you make fewer phone calls. It is that the risk moves from you to us. The sequence, the waiting between trades and the cost of putting mistakes right are ours, not yours.

Questions

Common questions about general contracting

Call Monday to Saturday, 8am to 5pm, or send the details and we call you back.

Is a general contractor more expensive than hiring trades separately?

Added up on paper, separate day rates often look lower. The difference shows up in what you cannot see in advance: waiting between trades, work done twice, and your own time. With a general contractor those are our costs, and they are already in the quote.

Do you use subcontractors?

Our own crew does the building work. For electrical, gas and plumbing we bring in specialists licensed for it, because Hungarian law requires it. All of them work under our contract, and your contract is with us.

What do you take on as general contractor?

Complete renovations of whole apartments, from strip-out to handover, in any district of Budapest, panel flats and pre-war apartments included. For older buildings, see renovating a classic apartment.

Who do I deal with during the work?

One person, the same one throughout. You never have to work out who to ask.

What does a complete renovation cost with a general contractor?

It depends on the apartment’s condition, its size and the products you choose. The typical price per square metre, and what it includes, are on our renovation cost page. For your apartment you get a fixed written price within two days of the survey.

How long does the renovation take?

Usually 8 to 10 weeks for a 50 to 60 m² apartment, from the strip-out to the handover, in a panel flat or a pre-war building alike. The exact schedule is part of the quote, and the completion date is in the contract. If we finish late, we pay a delay penalty set in the contract: 0.1% of the contract price for each day, up to 5% of the price in total.

Who draws the plans?

If you need plans, we bring in an architect or interior designer we know and trust, or we work from your own designer’s plans. Design is priced separately.

When do we pay?

In stages, following the schedule in the contract. Each stage is paid at its start, and the final instalment is due after handover.

What if the strip-out uncovers a hidden problem?

We tell you before we do anything, and we agree the cost in writing. In older Budapest buildings this happens, but it does not appear for the first time on the final invoice.

When do I get the schedule?

Within two days of the survey, with the written quote, before any contract. The schedule is part of the contract.

What happens at the handover?

We walk through the apartment together and sign a handover record. Anything still to be put right is written into that record. The 24-month guarantee on our work starts on that day.

Contact

Let us see the apartment.

The survey is free, and afterwards you get a fixed price and a schedule in writing.